Претрага
4506 items
-
Uncertainty in open pit optimisation
Kolonja Božo, Stevanović Dejan, Pešić Georgiadis Milica, Banković Mirjana, Kolonja Ljiljana. "Uncertainty in open pit optimisation" in 5th International symposium Mining and environmental protection, Beograd:Faculty of Mining and geology, Belgrade (2015): 358-392
-
GIS i daljinska detekcija Landsat 8 snimaka
Pešić Georgiadis Milica, Kolonja Ljiljana, Tomašević Aleksandra, Banković Mirjana. "GIS i daljinska detekcija Landsat 8 snimaka" in 1. savetovanje sa medjunarodnim učešćem Informacione tehnologije razvoj i primena u unapredjenju životne sredine, Beograd:Udruženje klaster komora za zaštitu životne sredine i održivi razvoj (2015): 86-97
-
Primary crusher site selection in open pit mines - case study in Sungun copper mine
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine de-sign process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location forprimary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Mehdi Rahmanpou. "Primary crusher site selection in open pit mines - case study in Sungun copper mine" in Underground mining engineering, Универзитет у Београду, Рударско-геолошки факултет (2021)
-
Quality of water in storage reservoirs related to the catchments lithology
Nikić Zoran, Ristić Ratko, Srećković Batoćanin Danica, Ristović Ivica. "Quality of water in storage reservoirs related to the catchments lithology" in First Serbian Forestry Congress under slogan Future With Forests, Topic B: Ecological Engineering in Protection of Soil and Water Resources, Belgrade:University of Belgrade, Faculty of Forestry (2011): 1037-1043
-
Опрема за континуалну контролу квалитета угља, on-line анализатори
Кнежевић Динко, Колоња Божо, Игњатовић Драган, Деушић Славен, Вучинић Душица, Томанец Рудолф. "Опрема за континуалну контролу квалитета угља, on-line анализатори" in International workshop COAL QUALITY MANAGEMENT, MAREN, Београд, Србија:Rudarsko-geološki fakultet (2011)
-
Coal production in Serbia, the social aspects and making strategic decision support
Beljić Čedomir, Ristović Ivica, Gligorić Zoran, Gluščević Branko, Tomašević Aleksandra. "Coal production in Serbia, the social aspects and making strategic decision support" in 3rd International Conference Economics and Management-Based on New Technologies EMoNT 2013, Vrnjačka Banja : (2013): 107-111
-
Improvement of Roadways Stability in Serbian Underground Coal Mines
Milisavljević Vladimir, Ristović Ivica, Čokorilo Vojin, Lilić Nikola, Miodrag Denić. "Improvement of Roadways Stability in Serbian Underground Coal Mines" in Proceedings/4th Balkan Mining Congress, :University of Ljubljana, Faculty of Natural Sciences and Engineering (2011): 533-538
-
Optimisation the final countur of the open pit North mining district using the software package Whittle
Kržanović Daniel, Stevanović Dejan, Rajković Radmilo, Jovanović Milenko, Žikić Miodrag, Stojadinović Saša (2016)Kržanović Daniel, Stevanović Dejan, Rajković Radmilo, Jovanović Milenko, Žikić Miodrag, Stojadinović Saša. "Optimisation the final countur of the open pit North mining district using the software package Whittle" in 48th International October Conference on Mining and Metaullurgy, Bor:Technical Faculty in Bor (2016): 435-439
-
Technical Solution for Reclamation of the Trachyte Open Pit Mine Kisnjeva Glava at Fruska Gora
Šubaranović Tomislav, Petrović Branko, Ivoš Vladimir, Ristović Ivica. "Technical Solution for Reclamation of the Trachyte Open Pit Mine Kisnjeva Glava at Fruska Gora" in Proceedings of the VI International symposium on mining and environmental protection, Vrnjacka Banja, Serbia:University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2017): 206-210
-
An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System
In this paper we describe the approach that has been used in the development of the Management Information System (MIS) in the Coal Mine Pljevlja in Montenegro. The methodology of this approach was based on new information technologies and management techniques which have already been successfully applied in other related fields. Its main goal was to introduce modern management techniques to mining, adapted to specific features of the mining industry, its operations and environment, thus enabling the tactical management ...Božo Kolonja, Ranka Stanković, Filip Vuković, Ivan Obradović. "An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System" in Proceedings of the Fifteenth International Symposium on Mine Planning and Equipment Selection, Torino, Italy, September 2006, Vol. 1,, Balkema (2006)
-
Hybrid Model for Optimisation of Waste Dump Design and Site Selection in Open Pit Mining
Aleksandar Doderovic, Svetozar-Milan Doderovic, Sasa Stepanovic, Mirjana Bankovic, Dejan Stevanovic (2023)Waste management is an unavoidable technological operation in the process of raw material extraction. The main characteristic of this technological operation is the handling of large quantities of waste material, which can amount to several hundred million cubic metres. At the same time, this operation must comply with all administrative and environmental standards. Therefore, optimising waste rock management (particularly haulage and dumping) has the potential to significantly improve the overall value of the project. This paper presents a hybrid ...Aleksandar Doderovic, Svetozar-Milan Doderovic, Sasa Stepanovic, Mirjana Bankovic, Dejan Stevanovic. "Hybrid Model for Optimisation of Waste Dump Design and Site Selection in Open Pit Mining" in Minerals, MDPI AG (2023). https://doi.org/10.3390/min13111401
-
Development of an Integrated Model for Open-Pit-Mine Discontinuous Haulage System Optimization
Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević, Dejan Stevanović (2024)The selection of the optimal equipment for discontinuous haulage systems is one of the most important decisions that need to be made when an open-pit mine is designed. There are a number of influencing factors, including natural (geological and environmental), technical, economic, and social. Some of them can be expressed numerically, in certain units of measure, while others are descriptive and can be stated by linguistic variables depending on the circumstances of the project. These factors are characterized by ...Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević, Dejan Stevanović. "Development of an Integrated Model for Open-Pit-Mine Discontinuous Haulage System Optimization" in Sustainability, MDPI (2024). https://doi.org/doi.org/10.3390/su16083156
-
Bioleaching Process for Copper Extraction from Waste in Alkaline and Acid Medium
Flotation wastes are becoming a valuable secondary raw material and source of many metals and semimetals worldwide with the possibilities of industrial recycling. The flotation tailings contain oxide and sulfide minerals that have not been sufficiently stabilized and form acidic mine waters, which in turn contaminate groundwater, rivers, and reservoi6sediments. An effective way to recycle these mine wastes is to recover the metals through leaching. While the focus is on acid bioleaching by iron- and sulfur-oxidizing bacteria, alkaline leaching, ...Ivica Ristović, Darina Štyriaková, Iveta Štyriaková, Jaroslav Šuba, Emilija Širadović. "Bioleaching Process for Copper Extraction from Waste in Alkaline and Acid Medium" in Minerals, MDPI (2022)
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
Coal homogenization stockyard sizing “Tamnava – Zapad” case study
Božo Kolonja, Dinko Knežević, Ranka Stanković, Dejan Stevanović, Detlef Trummer. "Coal homogenization stockyard sizing “Tamnava – Zapad” case study" in Proceedings of 13th International Symposium Continuous Surface Mining, ISCSM 2016, / (2016)
-
Novi pravilnik o sadržini rudarskih projekata
Kolonja Božo, Knežević Dinko, Lilić Nikola, Ignjatović Dragan, Danilović Dušan, Ivezić Dejan. "Novi pravilnik o sadržini rudarskih projekata" in International workshop COAL QUALITY MANAGEMENT, MAREN, multimedijalni zbornik prezentacija, Beograd, Srbija:Rudarsko-geološki fakultet (2013)
-
Model upravljanja investicionim projektima otvaranja površinskih kopova uglja
Cvjetko P. Stojanović (2015-04-27)Brze promene u okruženju pred rukovodioce postavljaju mnogobrojne zahteve,pre svega, one koji se tiču ostvarenja ciljeva u zadatom vremenu i raspoloživimsredstvima što zahteva fleksibilan pristup u organizovanju aktivnosti i efikasnost unjihovom sprovođenju.Upravljanje projektima, bilo koje vrste, suštinski, predstavlja veoma složenproces odlučivanja uslovljen velikim brojem ulaznih faktora. Ti faktori treba daomoguće fokusiranje na prioritete i ciljeve, praćenje realizacije, fleksibilnost uprevazilaženju teškoća, prilagođavanje promenama, te kontrolu nad ostvarenimrezultatima. Ovakav način upravljanja zahteva korišćenje proverenih tehnika i alata tetimski rad angažovanih na ...Cvjetko P. Stojanović. "Model upravljanja investicionim projektima otvaranja površinskih kopova uglja" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-04-27)
-
Model upravljanja investicionim projektima otvaranja površinskih kopova uglja
Cvjetko P. Stojanović (2015-04-27)Brze promene u okruženju pred rukovodioce postavljaju mnogobrojne zahteve,pre svega, one koji se tiču ostvarenja ciljeva u zadatom vremenu i raspoloživimsredstvima što zahteva fleksibilan pristup u organizovanju aktivnosti i efikasnost unjihovom sprovođenju.Upravljanje projektima, bilo koje vrste, suštinski, predstavlja veoma složenproces odlučivanja uslovljen velikim brojem ulaznih faktora. Ti faktori treba daomoguće fokusiranje na prioritete i ciljeve, praćenje realizacije, fleksibilnost uprevazilaženju teškoća, prilagođavanje promenama, te kontrolu nad ostvarenimrezultatima. Ovakav način upravljanja zahteva korišćenje proverenih tehnika i alata tetimski rad angažovanih na ...Cvjetko P. Stojanović. "Model upravljanja investicionim projektima otvaranja površinskih kopova uglja" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-04-27)
-
Navigacija budućnosti: poslovni rizici i prilike u rudarskoj industriji
Sektor rudarstva i metalurgije se globalno suočava sa brzo evoluirajućim okruženjem u 2024. godini, koje karakteriše jedinstvena međusobna zavisnost rizika i prilika. Sektor je u središtu globalne energetske tranzicije, uz rastuću potražnju za kritičnim mineralnim sirovinama poput litijuma, nikla i bakra, koji su od suštinskog značaja za tehnologije obnovljive energije i električna vozila. Međutim, ova sve veća odgovornost donosi brojne izazove, uključujući pojačanu pažnju na ekološke, društvene i upravljačke (ESG) faktore, fizičke i tranzicione rizike uzrokovane klimatskim promenama, i ...Petar Marković, Dejan Stevanović, Mirjana Banković, Vuk Lazić. "Navigacija budućnosti: poslovni rizici i prilike u rudarskoj industriji" in XVI međunarodna konferencija OMC 2024, Beograd : Jugoslovenski komitet za površinsku eksploataciju (2024)
-
Determination of Mechanical Properties of Altered Dacite by Laboratory Methods
This paper presents a methodology for determining the uniaxial and triaxial compressive strength of heterogeneous material composed of dacite (D) and altered dacite (AD). A zone of gradual transition from altered dacite to dacite was observed in the rock mass. The mechanical properties of the rock material in that zone were determined by laboratory tests of composite samples that consisted of rock material discs. However, the functional dependence on the strength parameter alteration of the rock material (UCS, intact ...Veljko Rupar, Vladimir Čebašek, Vladimir Milisavljević, Dejan Stevanović, Nikola Živanović. "Determination of Mechanical Properties of Altered Dacite by Laboratory Methods" in Minerals, MDPI AG (2021). https://doi.org/10.3390/min11080813