Particulate basalt–polymer composites characteristics investigation
Todić Aleksandar, Nedeljković Blagoje, Cikara Dejan, Ristović Ivica. "Particulate basalt–polymer composites characteristics investigation" in Materials and Design no. 32, :ELSEVIER (2011): 1677-1683. https://doi.org/10.1016/j.matdes.2010.09.023
-
Foundation reinforcement by micropiles
Ćorić Slobodan, Rakić Dragoslav (2015)Ćorić Slobodan, Rakić Dragoslav. "Foundation reinforcement by micropiles" in iNDiS 2015: Planning, design, construction and renewal in the civil engineering – International Scientific Conference no. 13, Novi Sad:Univerzitet u Novom sadu Fakultet tehničkih nauka (2015): 382-390
-
Thermal properties of soil
Djurić Tina, Rakić Dragoslav, Čaki Laslo, Ćorić Slobodan. "Thermal properties of soil" in 14 International Scientific Conference: Planning, Design, Construction and renewal in the Civil Engineering, Novi Sad: (2018): 1045-1052
-
Thermal properties of soil
Djurić Tina, Rakić Dragoslav, Čaki Laslo, Ćorić Slobodan. "Thermal properties of soil" in 14 International Scientific Conference: Planning, Design, Construction and renewal in the Civil Engineering, Novi Sad: (2018): 121-121
-
Development of an integrated model for open-pit-mine discontinuous haulage system optimization
Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović (2024)Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović . "Development of an integrated model for open-pit-mine discontinuous haulage system optimization" in Sustainability, MDPI (2024). https://doi.org/10.3390/su16083156
-
Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One
In order to solve serious traffic congestion in Belgrade, a number of studies regarding the Belgrade Metro construction have been carried out since 1973. However, only in 2019, the routes of the future metro lines 1 and 2 were de-fined as a part of the General Metro Construction Project. The lines are de-signed to intersect at the location of Sava Square, where an interchange met-ro station will be built. It represents a complex geotechnical structure consist-ing of three different ...Nemanja Stanic, Dragoslav Rakic, Josip Isek, Slavoljub Simic. "Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One" in Lecture Notes in Civil Engineering, Springer Nature Singapore (2024). https://doi.org/10.1007/978-981-97-8221-5_11
-
Device for more efficiency production of heavy oil
Danilović Dušan, Karović-Maričić Vesna, Batalović Veselin, Leković Branko. "Device for more efficiency production of heavy oil" in Chemical Engineering Research and Design 2 no. 90, London-Amsterdam -New York:Elsevier (2012): 238-242
-
Geotechnical aspects of three dimensional stability analysis of landslides
Ćorić Slobodan, Čaki Laslo, Rakić Dragoslav, Ubiparip Boško, Berisavljević Zoran. "Geotechnical aspects of three dimensional stability analysis of landslides" in Planning, design, construction and renewal in the civil engineering : proceedings / 12 International Scientific Conference INDIS 2012, Novi Sad, 28-30 November 2012, Novi Sad:Faculty of Technical Sciences, Department of Civil Engineering and Geodesy (2012): 361-368
-
Application of EC 7 standards in defining geotechnical conditions for the kiln foundation of cement factory Holcim – Serbia
Rakić Dragoslav, Ćorić Slobodan, Šušić Nenad. "Application of EC 7 standards in defining geotechnical conditions for the kiln foundation of cement factory Holcim – Serbia" in From research to design in European practice : proceedings of the XIVth Danube-European Conference on Geotechnical Engineering, Bratislava, Slovak Republic, 2nd - 4th June 2010, Bratislava, Slovakia:Slovak University of Technology, Faculty of Civil Engineering (2010): CD Session-CD Session
-
Tuffs of Serbia – what we need to know when characterising them as archaeological raw material
Vladica Cvetković, Kristina Šarić (2022)Vladica Cvetković, Kristina Šarić . "Tuffs of Serbia – what we need to know when characterising them as archaeological raw material" in Science for Conservation of the Danube Limes, Mortar Design for Conservation – Danube Roman Frontier 2,000 Years After. 1st International conference with workshop, Viminacium, Serbia, June 27th - July 1st, 2022 , Belgrade : Institute of Archaeology (2022)
-
Geostatički proračuni sanacije klizišta šipovima
U ovom radu su, polazeći od rezultata geotehničkih istraživanja, prikazani geostatički proračuni sanacije klizišta vertikalnim šipovima. Metodologija proračuna je složena, jer podrazumeva interakciju klizišta i stabilizirajućih šipova. Stoga se simultano analiziraju stabilnost klizišta i stabilnost šipova. Prilikom određivanja bočne otpornosti tla oko šipova koristi se metoda Brinč Hansena koja uzima u obzir trodimenzionalne uslove u tlu i može da se primeni u složenim geološkim uslovima koji su česti u Srbiji. Analize stabilnosti klizišta vrše se odgovarajućim metodama granične ravnoteže. ...sanacija klizišta, interakcija klizišta i šipa, bočna otpornost šipova, stabilnost klizišta i šipova... pp. 43-59. -18, Tuzla, 2000. NAVFAC, Design Manual DM -7.1., Soil mechanics, Department of the Navy, Alexandria, 1982. Poulos, H. G. and Davis, E. H.: Pile foundation analysis and design, John Wiley & Sons, New York, 1980. Tomlinson, M. J.: Foundation design and construction, The Pitman book, London ...Slobodan Ćorić, Dragoslav Rakić, Dušan Berisavljević. "Geostatički proračuni sanacije klizišta šipovima" in Zbornik radova osmog naučno-stručnog međunarodnog savetovanja - Geotehnički aspekti građevinarstva, Savez građevinskih inženjera Srbije, (2019)
-
Geological knowledge in service to archaeological investigations: rock and ceramic findings as examples
Kristina Šarić, Suzana Erić, Vladica Cvetković, Josip Šarić, Dragana Antonović, Vesna Bikić. "Geological knowledge in service to archaeological investigations: rock and ceramic findings as examples" in Science for Conservation of the Danube Limes, Mortar Design for Conservation – Danube Roman Frontier 2,000 Years After. 1st International conference with workshop, Viminacium, Serbia, June 27th - July 1st, 2022, Belgrade : Institute of Archaeology (2022)
-
Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia
Dragoljub Bajić, Dušan Polomčić (2014)A groundwater control system was designed to lower the water table and allow the pumping sta-tion “Bezdan 1” to be built. Based on a hydrodynamic analysis that suggested three alternative solutions, mul-ticriteria optimization was applied to select the best alternative. The fuzzy analytic hierarchy process methodwas used, based on triangular fuzzy numbers. An assessment of the various factors that influenced the selec-tion of the best alternative, as well as fuzzy optimization calculations, yielded the “weights” of the alternativesand the ...groundwater lowering, groundwater management scenario, fuzzy analytic hierarchy process,expert knowledge, triangular fuzzy numbers, linguistic variables... result, POLOMČIĆ & BAJIĆ (2014) proposed a groundwater control system for the “Bezdan 1” PS, whose function is to lower the water table to below the design eleva- tion, so that the pumping station can be built. Three alternatives were considered, to ensure protection against groundwater intrusion and provide ...
... DRAGOLJUB BAJIĆ & DUŠAN POLOMČIĆ104 tem is comprised of 12 wells, whose capacity is 40 l/s each. The time needed to lower the water table to below the design elevation and allow for the construction work to proceed is 5 days. • Alternative 2 (A2): Long-term average maximum stages of the canals within the ...
... s.l. The groundwater control system is comprised of 17 wells, whose capacity is 40 l/s each. The time needed to lower the water table to below the design elevation is 8.5 days. Based on the predictive analysis and the three iden- tified alternatives for the groundwater control system, as described in ...Dragoljub Bajić, Dušan Polomčić. "Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia" in Geološki anali Balkanskoga poluostrva, Belgrade : University of Belgrade - Faculty of mining and geology (2014). https://doi.org/10.2298/GABP1475103B
-
Using technology for knowledge transfer between academia and enterprises
Ivan Obradović, Ranka Stanković (2014)... 797 3 Conceptual design of the TEL platform An overview of the conceptual design of our TEL platform is depicted in Fig. 1. The platform consists of four groups of components, namely: • Tools - composed ...
... video, audio and textual format, supported by electronic terminological resources, services, and functionalities for searching and browsing. Design/methodology/approach – The TEL platform consists of tools and resources: learning, language and implementation resources. Among the tools some are ...
... terminology and its search and browse functions are lexical and textual resources and grammars. Implementation resources consists of best practice design principles and licensing tools to promote OER. Originality/value – Designing usable, effective and interactive TEL environments is a demanding ...Ivan Obradović, Ranka Stanković. "Using technology for knowledge transfer between academia and enterprises" in Knowledge and Management Models for Sustainable Growth, Proc. of IFKAD 2014, 9th International Forum on Knowledge Asset Dynamics, 11-13 June 2013, Matera, Italy, Bari : IFKAD (2014)
-
Extensive vibrations of the belt conveyer drive electromotor of a bucket wheel excavator as a result of intesified wear-and-tear of its mount support
Vesna Damnjanović, Predrag Jovančić, Snežana Aleksandrović. "Extensive vibrations of the belt conveyer drive electromotor of a bucket wheel excavator as a result of intesified wear-and-tear of its mount support" in Journal of Vibroengineering (2017). https://doi.org/10.21595/jve.2016.17321
-
Geotehnički uslovi izgradnje nadvožnjaka "Balajnac" na autoputu E-80 deonica: Niš - Merošina
Dragoslav Rakić, Nikola Božović (2024)U sklopu prve deonice autoputa E-80 Niš – Merošina, izgrađen je nadvožnjak u zoni sela Balajnac koji je oslonjen na tri stubna mesta na međusobnom rastojanju od oko 26 m. Svaki stub je fundiran na šipovima i to sa predloženim rasporedom od 2 šipa u grupi na međusobnom rastojanju od 3.6 m. U radu su na osnovu izvršenih geotehničkih istraživanja terena, analizirani rezultati nosivosti vertikalno opterećenog šipa prečnika 1.2 m i dužine šipa od L = 23 m. Analiza ...Dragoslav Rakić, Nikola Božović. "Geotehnički uslovi izgradnje nadvožnjaka "Balajnac" na autoputu E-80 deonica: Niš - Merošina" in Peti Srpski kongres o putevima, Beograd, 30-31.05.2024., Beograd : Srpsko društvo za puteve "Via Vita" (2024)
-
Stability analysis on slope PK dacite Ceramide
Safe surface mining exploitation of minerals is possibile only if stable bench and overall slopes in the open pit are construct. In order to to construct stable open pit slopes, it is necessary to carry out certain physical and mechanical laboratry testing of mineral raw materials in order to determine the geomechnical calculating parameters. These calculating parameters represent the base ground for performing slopes analyses and the open pit design. In this paper, an stability analysis of benches and ...Vladimir Čebašek, Veljko Rupar, Vladimir Ivoš, Vladimir Petković. "Stability analysis on slope PK dacite Ceramide" in VIII International geomechanics conference, Scientific And Technical Union of Mining, Geology and Metallurgy (2018)
-
Fragmentation Size Prediction of Blasted Material Using a Specialized Software for Drilling and Blasting
Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić, Miljan Gomilanović (2024)Design and optimizing the drilling and blasting parameters, should fill the requirements for the capacity, fragmentation size, and technical characteristics of loading and transport equipment, and enable a safe work at the open pit. Besides mentioned, it also achieves the minimal impact on the environment of the open pit and decreases the negative effects on the environment, especially in the blast vibration and flyrock. To obtain the best possible blasting effects and consider all the factors, a specialized software is ...Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić, Miljan Gomilanović. "Fragmentation Size Prediction of Blasted Material Using a Specialized Software for Drilling and Blasting" in The 55th International October Conference on Mining and Metallurgy, Mining and Metallurgy Institute Bor (2024). https://doi.org/10.5937/IOC24077M
-
Wells calculation for the protection of opencast mine Radljevo North from groundwater
Za projektovanje kvalitetnog sistema zaštite jednog površinskog kopa od podzemnih voda bitno je da ulazni podaci budu verodostojni, kako bi se na osnovu njih izvršili potrebni proračuni objekata odvodnjavanja podzemnih voda. Proračunima za površinski kop Radljevo Sever je omogućeno da se dobije potreban broj bunara kako bi oni pravilno funkcionisali i obezbedili potrebno obaranje podzenih voda.Dušan Polomčić, Vladimir Petković, Miloš Jeremić. "Wells calculation for the protection of opencast mine Radljevo North from groundwater" in XIII Međunarodna konferencija OMC, Zlatibor, 2018, Jugoslovenski komitet za površinsku eksploataciju (2018)
-
Optimization and Analysis of Drilling and Blasting Parameters Using O-Pitblast Software
The development of modern technologies has enabled the application of specialized softwares in the field of mining through various segments and processes, including in works related to drilling and blasting. The application of specialized software for drilling and blasting with the use of modern technologies such as photogrammetry enabled more accurate data from the field for later processing. By processing data and creating a 3D model of the terrain for drilling and blasting works, it can obtain precise data, ...Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić. "Optimization and Analysis of Drilling and Blasting Parameters Using O-Pitblast Software" in Podzemni radovi, Beograd : Rudarsko-geološki fakultet (2024)