Analysis Of the Process Of Carbon Capture Utilization And Storage In Underground Reservoirs
John Nyame (2024)The importance of mitigating the effects of global climate change has necessitated an in-depth exploration of innovative strategies to reduce carbon dioxide (CO2) emissions. Among these strategies, Carbon Capture, Utilization, and Storage (CCUS) has emerged as a promising and transformative solution. This master thesis delves into the diverse realm of CCUS processes, aiming to unravel the positives challenges, and opportunities within this dynamic field. The analysis begins with a systematic examination of carbon capture technologies, encompassing post-combustion, pre-combustion, and oxy-fuel combustion ...... dioxide capture and storage is considered crucial for reducing CO- emissions in various industries. Carbon capture, utilization and storage (CCUS) is an innovative approach that involves the capture, utilization, and storage of carbon dioxide to mitigate greenhouse gas emissions and combat climate ...
... Figure 1.2 A background of the Carbon Capture and Storage Process [7] Capture . _ Transport Utilization/Storage CCUS Facility . CO, Sources Oil/gas Prođuction imcreaxe Figure 1.3 A full scale ofa Carbon Capture, Utilization and Storage process 2. CARBON CAPTURE ANALYSIS Carbon capture ...
... Analysis Of the Process Of Carbon Capture Utilization And Storage In Underground Reservoirs John Nyame Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Analysis Of the Process Of Carbon Capture Utilization And Storage In Underground Reservoirs | John Nyame | ...John Nyame. Analysis Of the Process Of Carbon Capture Utilization And Storage In Underground Reservoirs, 2024
-
Izdvajanje vode iz prirodnog gasa
Dejan Nedeljkov (2024)U radu je istaknuto važnost prirodnog gasa kao vitalna komponenta svetske energetike.Spada u najsigurnije,najčistije i najkorisnije fosilno gorivo. Sama pojava vode u vidu vlage u gasu je pokazatelj lošeg kvaliteta gasa. parametri koji mogu dovesti do lošeg kvaliteta prirodnog gasa kao pokazatelj je Wobbe index.U okviru istraživanja u master radu glavni problem funkcionisanja na KPG Paliću predstavlja vlaga u gasu,takođe se može zaključiti da kvalitet gasa zavisi od Wobbe indeksa odnosno, što je Wobbe veći, čistiji je gas, ili ...... 1968. godine [20] Ken Ranold, Maurice Steward: Designing oil and gas production system – How to size and select three phase separators, World Oil, Decembar, 1984. godine [21] D. Kataz: Natural gas Engineering, Production and Storage. [22] M. Soleša, N. Đajić: Proizvodnja i korišćenje geotermalne ...
... u slučaju neusklađenosti može doći do suprotnog učinka, odnosno poremećaja rada separatora. ! D. Kataz: Natural gas Engineering, Production and Storage, str. 54 ! M. Soleša, N. Đajić: Proizvodnja i korišćenje geotermalne energije, Rudarsko — geološki fakultet, Beograd, 1995., str.76 !? M. Šašić: ...
... Stewart M.,Surface Production Operations, Design of Gas Handling Systems and Facilities Burlington Elsevier, 1999.godine [2]American Petroleum Institute, Specification for Oil and Gas Separators, API Publications and Distribution, Washington DC, 1999. godine [3] Bodor, J., Szabo J., Strength ...Dejan Nedeljkov . Izdvajanje vode iz prirodnog gasa, 2024
-
Отпад из процеса сагоревања угља као сировина за добијање елемената ретких земаља
Бојан Земљак (2024)Због великог броја индустрија у којима се користе ови ресурси, глобална економија се у великој мери ослања на елементе ретких земаља. Елементи ретких земаља су есенцијална сировина — материјал за развој савремених технологија, али у односу на њихову огромну потражњу, њихово вађење је ограничено и повезано је са значајним утицајима на животну средину. Због њихове ограничене доступности, проблема који се јављају при процесима експлоатације, све више и више земаља почиње да тражи повољније могућности вађења елемената [REE] из секундарних ...... materials with high-efficiency energy storage and conversion for batteries and fuel cells. Coordination Chemistry Reviews, 253(23-24), p.2805-2813. [62] Malczewska-Toth, B., 2012. Titanium, zirconium, and hafnium. Paffty's Toxicology. 6th ed. New York: John Wiley and Sons Ltd, p.427-74. [63] Balaram ...
... Fuel, 87(6), p.857-869. [166] Panda, L. and Dash, S., 2020. Characterization and utilization of coal fly ash: a review. Emerging Materials Research, 9(3), p.921-934. [167] Wang, Z., Dai, S., Zou, J., French, D. and Graham, I.T., 2019. Rare earth elements and yttrium in coal ash from the Luzhou power ...
... Technologies: Beneficiation, Utilization, Transport Phenomena and Prospective. p. 431-471. Cham: Springer International Publishing. [175] Mukaba, J.L., Eze, C.P., Pereao, O. and Petrik, L.F., 2021. Rare carths” recovery from · phosphogypsum: an overview on direct and indirect | leaching techniques ...Бојан Земљак. Отпад из процеса сагоревања угља као сировина за добијање елемената ретких земаља, 2024
-
Uticaj raspadanja na stabilnost kosina u mekoj stenskoj masi
Anđela Despotov (2024)U radu je opisano ponašanje mekih stenskih masa koje su izložene porecesu raspadanja tokom određenog vremenskog perioda. Meke stenske predstavljaju kritične vrste stenskih masa pošto izazivaju različite probleme tokom izvođenja građevinskih radova. Meke stene mogu biti sedimentne stene, raspadnute metamorfne i magmatske stene. Odlikuju se niskim vrednostima čvrstoće, visokom deformabilnošću, visokom plastičnošću, podložne su dezintegraciji i fizičko-hemijskom raspadanju, odnosno ubrzanom dejstvu površinskog raspadanja usled atmosferskih uticaja.Za klasifikaciju mekih stenskih masa koriste se modifikovane verzije već postojećih klasifikacionih sistema. Jedan ...... Colloquium. Schubert & Kluckner (eds.) OGG 5. Barla, G., (1990), Stress, Strength and Deformability Assessment for the Design of Large Storage Caverns in a Weak Jointed Chalk. Third Cycle of Conferences on Rock Mechanics and Engineering - MIR90 - Le Tocce Tenere -Weak Rocks (pp.22-1 to 22-21). Politecnico ...
... Institution of Mining and Metallurgy 527 p, London 19. ISO 14689:2017 Geotechnical investigation and testing - Identification, description and classification of rock 20. Sandeen, J., (2023), Mechanical Weathirng, CK-12 Foundation 21. Kanji, M., (2014), Journal of Rock Mechanics and Geotechnical Engineering ...
... , Pineda, J.A., (2006) Weathering and degradation of shales: experimental observations and models of degradation. VI South American Rock Mechanics Conference. Cartagena de Indias, Colombia 3. ASTM. (2008) Standard Test Method for Slake Durability of Shales and Similar Weak Rocks. ASTM designation ...Anđela Despotov. Uticaj raspadanja na stabilnost kosina u mekoj stenskoj masi, 2024
-
Analysis of performed workover in wells
Momir Radovanović (2023)This paper will describe and explain workover that are carried out in the wells, the types of these works and their division according to the scope of the works that are carried out, the tools and operations that are most often used and performed in order to enable the well and return it to production. Since the range of operations and tools that are used in workover is very wide, the most common operations and tools used are listed and ...Momir Radovanović. Analysis of performed workover in wells, 2023
-
Cement Slurries for Drilling Fluid Loss Control
Miljan Stojiljković (2022)In the oil industry cements are clasiffied according to API standard. API cements are made for oil drill wells and are made the same way as the Portland cement is made, from the same compounds, but in different relations. These cements are projected to fulfill different conditions in oil drill wells. Different additives are added to change certain cement properties. Additives used in oil industry affect hardening time, cement density and viscosity change. Cement represents basic tool for closing ...Miljan Stojiljković. Cement Slurries for Drilling Fluid Loss Control, 2022
-
Design and performing gravel pack using mechanical packer
Dejan Pavlov (2022)During the production of reservoir fluids, production of layer sand may occur due to one or a combination of several factors. These factors are the reservoir rock type, which can be unconsolidated sandstone, high depression value, increased water cut, turbulent flow regime of the reservoir fluid in the near-well zone, or hydraulic impacts that occur during the operation of the suck rod pump. This paper will include production wells completion with an improved Gravel Pack system, which enables more ...Dejan Pavlov. Design and performing gravel pack using mechanical packer, 2022
-
Петрологија црвених пешчара источне Србијe
Андреј Марковић (2024)У источној Србији формација црвених пешчара има велико распрострањење и улази у састав многих планина овог дела наше земље. Формацију чине кластичне стене интензивно црвене боје псамитске, ређе псамитско-псефитске структуре и алевритске структуре. Ове стене леже трансгресивно преко старијих пермо-карбонских и карбонских стена, док навише прелазе у доњотријаске седименте. Формација црвених пешчара захвата два појаса унутар Карпато-балканида – унутрашњи и средишњи део. Узорци анализирани у овом раду део су средишњег појаса. Тема завршног рада је петрологија црвених пешчара источне ...... widespreaded and is included in the composition of many mountains in this part of our country. This formation consists of intensely red-colored clastic rocks, psammitic, rarely psammite-psephitic and siltstone structure. These rocks lie transgressively above older Permo-Carboniferous and Carboniferous ...
... were applied. According to structural and petrological-mineralogical parameters, analyzed sandstones are defined as siltstone sandstones-arkoses. They are built of quartz, feldspar, rock fragments, micas and binders. According to size, degree of roundness and sorting, they are determined as fine-grained ...
... — inner and central part. Samples analyzed in this paper are part of the centre belt. Subject of the final paper is petrology of the red sandstones of Eastern Serbia, more specifically samples from the area around Grza River near Paraćin. After macroscopic determination, optical and chemical ...Андреј Марковић. Петрологија црвених пешчара источне Србијe, 2024
-
Regulacija nivoa tečne faze u vertikalnim separatorima
Katarina Šoštarić (2024)Ovaj diplomski rad bavi se regulacijom nivoa tečne faze u vertikalnim separatorima u industriji nafte i gasa. U radu su istraženi različiti metodi merenja nivoa, uključujući plovke, ultrazvučne i radarske senzore. Radarski senzori su se pokazali kao najefikasniji u teškim radnim uslovima, zahvaljujući njihovoj visokoj preciznosti i pouzdanosti. Rad uključuje teoretski pregled metoda merenja nivoa, detaljno poređenje prednosti i nedostataka različitih senzora, kao i studiju slučaja implementacije radarskog senzora u vertikalnom separatoru. Analiza rezultata i preporuke za buduća istraživanja ...... separators in the oil and gas industry. Different methods of level measurement were investigated in the paper, including floats, ultrasonic and radar sensors. Radar sensors have proven to be the most effective in difficult working conditions, thanks to their high precision and reliability. The paper ...
... methods, a detailed comparison of the advantages and disadvantages of different sensors, as well as a case study of the implementation of a radar sensor in a vertical separator. An analysis of the results and recommendations for future research and improvement are also presented. Keywords: Level ...
... слободном приступу. - Претрага репозиторијума доступна је на www.dr.rgf.bg.ac.rs The Digital repository of The University of Belgrade Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf ...Katarina Šoštarić. Regulacija nivoa tečne faze u vertikalnim separatorima, 2024
-
Analiza primenjenih metoda za transport parafinske nafte
Dunja Milojević (2024)Sadržaj parafina u nafti ima dominantan uticaj na svojstva parafinskih nafti. Taloženje parafina, odnosno taloženje čvrstih čestica parafinskog voska, predstavlja ozbiljan globalni problem tokom proizvodnje i transporta sirove nafte. Samo taloženje voska zavisi od termodinamičkih faktora, poput temperature, pritiska i sastava nafte. Transport nafte cevovodima je uobičajeni proces transporta u naftnoj industriji. Kada prilikom cevovodnog transporta parafinske sirove nafte, dođe do prekida protoka i hlađenja nafte ispod temperature stinjavanja, parafini će kristalisati, pri čemu će doći do, geliranja celokupne transportovane ...... Science and Engineering. 12.iStock. (n.d.). Oil pipeline images. Preuzeto sa istock: https://www.istockphoto.com/search/2/image- film?phrase=oil%20pipeline&servicecontext=srp-related 41 13.MAPEFRE Global Risks. (2022). Oil and gas pipelines — veins of the economy. Risks Management and Insurance ...
... LITERATURA l. Abdel-Aal, H. (2021). Economic Analysis of Oil and Gas Engineering Operations. New York: CRC Press. 2. Alnaimat, F., Ziauddin, M., & Mathew, B. (2019, November 27). Wax Deposition in Crude Oil Transport Lines and Wax Estimation Methods. IntechOpen Journal. 3. BeoControl Logistic ...
... Science and Technology. 10.Elmabrouk Ali Elhaddad, E. (2014). NOV!I MODEL ZA POSTIZANJE OPTIMALNE PROIZVODNJE NA NAFTNOM POLJU AMAL. Beograd: Univerzitet u Beogradu, Rudarsko geološki fakultet. 11. Guozhong, Z., & Gang, L. (2010). Study on the wax deposition of waxy crude in pipelines and its ...Dunja Milojević. Analiza primenjenih metoda za transport parafinske nafte, 2024
-
Одређивање оптималне производње дубинске пумпе на клипним шипкама
Небојша Савић (2024)Дужи временски период током историје производње нафте, дубинске пумпе на клипним шипкама су први и у многим случајевима једини избор када су у питању механичке методе експлоатације. Правилан одабир сваког појединачног елемента система омогућава оптимизацију која са собом повлачи бенефите у виду повећавања ефикасности и смањења трошкова. Тренутно примењени систем дубинских пумпи на клипним шипкама на лежишту „Н“ обезбеђује стабилну производњу и реализацију годишњих планова производње без већих проблема. У овом раду је приказан начин оптимизације производње дубинским пумпама ...... 123 Crank offset anole (deorees) 00 Monthiy electric bik' [27] lectr co3t per m*ffuid #%515 Electr cost per m? ol 83987 Tubing And Pump Information Tubing, Pump And Plunger Calculatons Tubinq O.D.(mm): 73025 Upstr rod{i damo. coeMd. 0100 Tubinq stretch (cm) o Tubina | D (memj: 62001 Dnstr rod4i ...
... Crank offset anqle (deqrees) 00 Monthly electric bili #375 Electr.cost pet m fluid: 81601 Electr cost pet m? oil 3%7277 Tubing And Pump Information Tubing, Pump And Plunger Cakuulations Tubine O.D. (mm): 73.025 Upstr.rod-! damp.coeM. 0100 -| Tubima steetch (cm): o Tubina | D.(mm}: 62001 Dnstr ...
... anqle (degre5) 00 Monthly electnc bili %194 %198 Electr cost per m fluiđ: 90847 90864 Electr cost pet m? oil 33852 %3929 Tubing And Pump Information Tubing. Pump And Plunger Cakculations Tubing O.D. (mm): 73.025 Upstr, rod-fi damo.coef . 0100 ~| Tubina stetch (cm): d Tubma ! D (mm}): 62001 Dnstr ...Небојша Савић. Одређивање оптималне производње дубинске пумпе на клипним шипкама, 2024
-
Remontni radovi u bušotini sa dubinskom pumpom
Jovana Milošević (2024)Remontni i stimulativni radovi u naftnom inženjerstvu su radovi koji se primenjuju na bušotinama koje su već u proizvodnji ili potencijalno proizvodnim bušotinama, i u zavisnosti od toga imaju različitu svrhu. Remontni radovi predstavljaju sve radove koji su ograničeni na kanal bušotine, dok se stimulativni radovi odnose pribušotinsku zonu.U prvom slučaju remontni i stimulativni radovi kod proizvodnih bušotina služe za otklanjanje problema i povećavanje proizvodnje bušotine. Dok u drugom slučaju, kod potencijalnih bušotina su ovi radovi namenjeni završnim obradama ...... perforation technology: Status and prospects. (2014). Preuzeto sa ResearchGate: https://www.researchgate.net/publication/270914514_Oil_well_perforation_technology_St atus_and_prospects PAŠIĆ, D. D. TEHNIKA IZRADE BUŠOTINA 1, BUŠAĆA POSTROJENJA. Perforating Oil and Gas Wells. (n.d.). Preuzeto sa ...
... sa AONG: https://www.arab-oil- naturalgas.com/perforating-oil-and-gas-wells/ Perforating Oil and Gas Wells. (2020). PETROBLOGWEB. (2016). Preuzeto sa PETROLEUM ENGINEERING, SAND PRODUCTION: https://petroblogweb.wordpress.com/2016/09/03/overview-of-standalone-screensliner- sand-exclusion-options/ ...
... SCHOLAR. (2017). Preuzeto sa Relative Study of Internal Gravel Packing and Chemical Sand Consolidation: Sand Control Techniques of Niger Delta Wells: https://www.semanticscholar.org/paper/Relative-Study-of-Internal-Gravel-Packing-and- Sand-Maduabuchi-Appah/bffcd6dbeefe6c91fd3056a9e354320f1 38ea608 ...Jovana Milošević . Remontni radovi u bušotini sa dubinskom pumpom, 2024
-
Анализа утицаја искоришћења у преради на резултате оптимизације површинских копова
Стефан Митић (2024)Одређивање оптималних граница површинског копа је сложен и итеративни процес који захтева мултидисциплинарну експертизу, софистициране технике анализе и пажљиво разматрање геолошких, рударских, економских,техничких, еколошких и друштвених фактора. Оптимизација подразумева генерисање серије шкољки, површинског копа на основу различитих фактора прихода (Revenue factor) са итеративним кораком промене цене метала у односу на базну цену. Свака генерисана шкољка представља инкрементално повећање запремине резерви према инкременталном повећању продајне цене метала. Велики број техно -економских фактора утиче на овај процес, и промена сваког од њих ...оптимизација површинског копа, анализа границе копа, оптимална контура копа, лежиште Бувач, профит, искоришћење у преради, трошкови прераде руде... Mines. Perth, Orebody Modelling and Strategic Mine Planning Symposium. 10. Hartman, H. L., 1992. SME Mining Engineering Handbook. Littleton, Colorado: Society for Mining, Metallurgy, and Exploration, Inc.. 11. Hustrulid W, Kuchta M, 1998. Open Pit Mine Planning and Design. Vol 1 ed. Rotterdam ...
... Wharton C., 2004 . Development and Application of Whittle Multi-Mine at Geita Gold. Perth, Proceedings of the Orebody Modelling and Strategic Mine Planning Conference. 15. Kennedy B. A., 1990. Sur/face Mining. Littleton, Colorado: Society for Mining, Metallurgy, and Exploration, Inc.. 16. KpxxaHonpuh ...
... planning conference. 29. Whittle D., 2011. Open-Pit Planning and Design, SME Mining Engineering Handbook. 3rd ed. s.1.:Society for Mining, Metallurgy, and Exploration, Inc. (SME). 30. Whittle J., 1999. A decade of open pit mine planning and optimization - The craft of turning algorithms into packages ...Стефан Митић. Анализа утицаја искоришћења у преради на резултате оптимизације површинских копова, 2024
-
Анализа примене утискивања полимера за повећање искоришћења лежишта „Х“
Јана Ивановић (2024)Лежиште „Х“ се налази у Панонском басену и део је нафтно-гасног поља „ХХ“.С обзиром на висок удео воде у произведеном флуиду на лежишту је потребно применити неку методу којом би се смањила брзина напредовања фронта воде ка производним бушотинама, односно смањио удео воде у производњи. Овај рад има за циљ да детаљно испита могућност примене једне од допунских метода повећања искоришћења лежишта, методе утискивања полимера на изабраном лежишту „Х“. Први део рада приказује основне теоријске појмове на којима се ...... Field in South Oman - Initial Results and Future Plans”, 2012. [4] Cai Shuwet, He Xianru, Liu Kun, „Macromolecular interactions and synergy in xanthan/HPAM aqueous solution”, Royal Society of Chemistry, 2017. [5] Chang Hong Gao, „Scienfific research and field applications of polymer Jlooding ...
... Emmanuel, „Numerical Simulation and Optimisation of Polymer Flooding ı in a Heterogenous Reservoir: Constrained Versus Unconstrained Optimisation”, Institute of GeoEnergy Engineering, Heriot-Watt University, 2021. [15] Jie Xiao, Guilbiao Qiao, „Understanding the Problems and Challenges of Polymer Flooding ...
... Oil & Gas Research, 2017. [16] Kasimbazi Gloria, „Polymer Flooding”, master thiesis, Norwegian university of science and technology, Department of Petroleum Engineering and applied geophysics, 2014. [17] Ming Han, Hianmin Zhou, Fuseni B. Alhasan, Badr Zahrani, Abdulkareem M. AlSofi, „Laboratory ...Јана Ивановић. Анализа примене утискивања полимера за повећање искоришћења лежишта „Х“, 2024
-
Proračun recirkulacionih pumpi u postrojenju za odsumporavanje dimnih gasova ,,TENT B"
Tomislav Trpković (2024)Predmet ovog rada baziraće se na proračunu i usvajanju mašinskih instalacija potrebnih za nesmetano funkcionisanje sistema dve međusobno povezane celine Absorber - Pumpna stanica, preko FRP ( Fiberglass Reinforced Plastic) cevovoda kojim se odvija transport suspenzije krečnjaka neophodnog u samom procesu odsumporavanja dimnih gasova. Pored tehničkog opisa same tehnologije koja uključuje tri objekta: Absorber, Pumpna Stanica i cevovod, glavni deo rada odnosiće se na proračun i usvajanje mašinskih instalacija koji uključuju recirkulacione radijalne centrifugalne pumpe i cevovode kojima ...postrojenje za odsumporavanje dimnih gasova, termoelektrana, pumpna stanica, FRP cevovod, Absorber, transport suspenzije gipsa, prirubnica, ventil, potisni cevovod, usisni cevovod... the terminology and the operation of the thermal power plant and the desulfurization process. The second part of the paper will discuss the location designated for the flue gas desulfurization plant and the meteorological and other parameters necessary for the calculation and adoption of the ...
... which includes three facilities: the Absorber, the Pump Station, and the pipeline, the main part of the paper will focus on the calculation and adoption of mechanical installations, including recirculating radial centrifugal pumps and pipelines for transporting the gypsum suspension. The work is ...
... explaining in detail the operation of the transport of the limestone and gypsum suspension through the recirculating pumps and pipelines to the Absorber. In the final part of the paper, attention will be given to the calculation and adoption (dimensioning) of the mechanical installations at one pump ...Tomislav Trpković. Proračun recirkulacionih pumpi u postrojenju za odsumporavanje dimnih gasova ,,TENT B", 2024
-
Mehanizam nastanka bjelasičke klipe u internim Dinaridima severne Crne Gore
Katarina Stefanović (2024)Bjelasička klipa predstavlja segment Internih Dinarida na području severne Crne Gore. Područje obuhvata tektonski kontakt Drinsko-ivanjičke jedinice i Istočnobosansko-durmitorske jedinice, pri čemu se na širem području nalaze i jedinice Prekarst i Zona bosanskog fliša. Tektonska klipa Drinsko-ivanjičke jedinice, odnosno bjelasička klipa, kao i generalna tektonska evolucija područja u kom se ona nalazi, nisu izučeni u adekvatnoj meri. Stoga je cilj ovog rada pribavljanje novih podataka o tektonskoj evoluciji bjelasičke klipe, koji mogu biti značajan prilog za bolje poznavanje geodinamičke ...Interni Dinaridi, paleonaponska analiza, bi-direkciona ekstenzija, rased Skadar-Peć, dekstralno smicanje... field and tectonic inversion in the Pannonian basin, Global and Planetary Change, 58 (1—4), str. 105—180. Delvaux, D., Sperner, B., 2003. Stress tensor inversion from fault kinematic indicators and focal mechanism data: the TENSOR program. In: New Insights into Structural Interpretation and Modelling ...
... 2013. The balance between orogenic building and subsequent extension during the 66 Tertiary evolution of the NE Dinarides: Constraints from low-temperature thermochronology. Globa! and Planetary Change, 103: 19—38. Turner, F.J., 1953. Nature and dynamic interpretation of deformation lamellae ...
... Grund, M.U., Handy, M.R., Giese, J., Gemignani, L., Pleuger, J., Onuzi, K., 2023. Faulting, basin formation and orogenic arcuation at the Dinaric-Hellenic junction (northern Albania and Kosovo).mfermational Journal of Earth Sciences, 112: 1613—1634, str. 1-22.. Handy, M.R., Giese, J., Schmid ...Katarina Stefanović . Mehanizam nastanka bjelasičke klipe u internim Dinaridima severne Crne Gore, 2024
-
Тeхничка и биолошка рекултивација као технолошки процес рада на спољашњем одлагалишту површинског копа „Дрмно“ РБ Костолац
Александар Милојковић (2024)У овом мастер раду приказани су општи и детаљни подаци о спољашњем одлагалишту површинског копа ,,Дрмно“ Костолачког угљеног басена и детаљна концепција коришћења равних и косих површина намењених за рекултивацију.Такође, приказан је и опис спољашњег одлагалишта са тачно утврђеним границама површина које ће бити предмет рекултивације. Као специјалистички део овог мастер рада приказано је извођачко техничко пројектно решење реализације техничке и биолошке рекултивације. Усвојеним решењем приказана је технологија формирања одлагалишних етажа, техника извођења радова применом технолошке усвојене механизације и ...Дрмно, површински коп, спољашње одлагалиште, техничка рекултивација, биолошка рекултивација, динамика радова, предмер и предрачун... influencing its process are described, and the choice of methods of planting and caring for appropriate crops is defined. Besides, the dynamics ofperforming technical and biological recultivation has been determined, with total amount of works counted, and measure and accounting trough the techno-eco ...
... IHpeHnMep H rpenpauyH. Abstrack This Master work contains both main and detailed information about external disposal site of The „Drmno“ surface mine, coal basin of Kostolac, and detailed conception of using flat and sloping surface meant for recultivation. Also, there is a writting about ...
... project solution for the realization of technical and biological recultivation. The soluton shows the technology of forming landfill floors, techniqueof carrying out works using technologically adopted mechanization and equipment. The size, character and lack of areas for biological recultivation are ...Александар Милојковић. Тeхничка и биолошка рекултивација као технолошки процес рада на спољашњем одлагалишту површинског копа „Дрмно“ РБ Костолац, 2024
-
P-T analiza uglja RB Kolubara
Rada Vitomir (2024)Rudarski basen Kolubara predstavlja jedno od najvažnijih ležišta lignita u Republici Srbiji i ključni je faktor u snabdevanju zemlje energijom. Kvalitet uglja iz ovog basena direktno utiče na efikasnost termoelektrana i zadovoljenje energetskih potreba. U ovom radu, opisan je značaj tehničke i elementarne analiza uglja kako bi se utvrdili fizičko-hemijski parametri uglja iz Rudarskog basena Kolubara. U drugom delu rada dat je opis P-T analize uglja i njen značaj za ocenu mogućnosti čišćenja uglja. Takođe, dati su i rezultati ...... prvom redu ı ukazuju na moguće pravce rešenja uočenih problema. 68 LITERATURA . Ahmaruzzaman, M. (2010). A review on the utilization of fly ash. Progress in energy and combustion science, 36(3), 327-363. . Bogdanović, V., Ilić, Z., & Polomčić, D. (2007). Izbor ograničenja i otvaranja površinskog ...
... C., Frandsen, F. J., & Spliethoff, H. (2018). Ash formation and deposition in coal and biomass fired combustion systems: Progress and 69 challenges in the field of ash particle sticking and rebound behavior. Progress in energy and combustion science, 68, 65-168. 11. Kostović M., Industrijski ...
... Arsenic hazards in coal fly ash and its fate in Indian scenario. Resources, Conservation and Recycling, 55(9-10), 819-835. 17.Rasulić, N., Delić, D., Kuzmanović, S., Jošić, D., Kuzmanović, Đ., Anđelović, S., & Stajković-Srbinović, O. (2013). Agrochemical and microbiological properties of the ...Rada Vitomir. P-T analiza uglja RB Kolubara, 2024
-
Одређивање оптималних параметара цевовода за двофазни проток
Николина Ћурчић (2024)Eфикасно управљање протоком флуида је кључно за оптимизацију перформанси система и обезбеђивање оперативне сигурности. Двофазни ток, који подразумева истовремено присуство течне и гасне фазе унутар цевовода и измењивача топлоте, представља један од најсложенијих аспеката динамике флуида. Овај феномен намеће јединствене изазове који захтевају дубоко разумевање и прецизно планирање. Ефикасно управљање двофазним током није само кључно за одржавање ефикасности система, већ је и неопходно за спречавање потенцијалних проблема као што су повећана ерозија, неочекиване флуктуације притиска и ризици по безбедност. У ...... to Oil and Gas Pipelines. Retrieved from FracTracker Alliance: https://www.fractracker.org/2016/06/introduction-oil-gas- pipelines/ Arya, A. K. (2022). A critical review on optimization parameters and techniques for gas pipeline operation profitability. owrma! of Petroleum Exploration and Production ...
... The Lifeline and Liability of Qur Energy Infrastructure. Retrieved from CompilanceSigns: https://www.compliancesigns.com/blog/pipelines-the-lifeline-and-liability-of- our-energy-infrastructure/ Enbridge. (2018, May 30). Why are pipelines the best, safest way to transport oil and gas? Retrieved ...
... слободном приступу. - Претрага репозиторијума доступна је на www.dr.rgf.bg.ac.rs The Digital repository of The University of Belgrade Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf ...Николина Ћурчић. Одређивање оптималних параметара цевовода за двофазни проток, 2024
-
P-T analiza RMU Bitola – krupne klase
Nemanja Dobrosavljević (2024)Cilj ovog diplomskog rada je bio ispitivanje mogućnosti i tehnologije čišćenjauglja, kao i predstaviti rezultate pliva – tone analize koja ima za cilj ocenu mogućnosti čišćenja uglja - krupnih klasa posmatranog uzorka. Da bi se ispitivanje i analiza mogućnosti čišćenja rovnog uglja u REK Bitola uspešno priveli kraju, moralo se uraditi uzorkovanje reprezentativnog uzorka iz koga se potom izdvaja prvi deo koji služi za određivanje sadržaja vlage. Pored tog dela iz uzorka se izdvaja i drugi njegov deo koji će ...ugalj, lignit, Bitola, PT analiza, pliva-tone analiza, čišćenje uglja, suvi ugalj, vlažan ugalj, pepeo, donja toplotna moć, čist ugalj, jalovina, bilans... its granulometric composition was performed, using standard and non- standard sicves with the following opening diameters: 60; 31.5; 16; 5; 0.5; 0.25; 0.125 and 0.00 mm. After measuring the size classes, the results are shown in tabular and graphical form. In the special part of the diploma thesis ...
... of 1.6 t/m* and 1.7 t/m?. Processing of P-T analysis results was performed on a "dry" coal sample (dried at 105%C) and then on a "moist" coal sample (total moisture 40.14%). After processing the results, forecast balances were made for the analyzed layering densities of 1.6 t/m* and 1.7 t/m?,. ...
... be used for the analysis of pit coal, and then a third part of the sample, which will be used for determining the granulometric composition. At the end, a part ofthe sample is separated from the sampled pit coal for PT analysis. After sampling the pit coal and dividing it into segments for further ...Nemanja Dobrosavljević. P-T analiza RMU Bitola – krupne klase, 2024