The Fuzzy–AHP Synthesis Model for Energy Security Assessment of the Serbian Natural Gas Sector
Natural gas is used for the production of almost 20% of total energy today. The natural gas security of the Republic of Serbia is an urgent strategic, political and security issue. Serbia is one of the most vulnerable countries in Southeast Europe, because it only has one supply route. This study is a contribution to efforts to better understand the factors affecting energy security through the implementation of a new methodology based on the fuzzy–AHP synthesis model for measuring ...... modifies the fundamental axioms of the classical AHP model. However, when the fuzzy set theory is applied to the AHP, the judgements of the decision-maker are no longer exact, and they have fuzzy uncertainty. This is the weakness of the fuzzy–AHP based model. The limits of application of this model lie in ...
... 04:10:20 The Fuzzy–AHP Synthesis Model for Energy Security Assessment of the Serbian Natural Gas Sector Aleksandar R. Madžarević, Dejan D. Ivezić, Miloš L. Tanasijević, Marija A. Živković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] The Fuzzy–AHP Synthesis Model ...
... n of a new methodology based on the fuzzy–AHP synthesis model for measuring energy security. This new methodology was used to identify the energy, economic, environmental, social and technical indicators that accompany energy security analysis. The fuzzy–AHP synthesis model uses the asymmetric fuzzy ...Aleksandar R. Madžarević, Dejan D. Ivezić, Miloš L. Tanasijević, Marija A. Živković. "The Fuzzy–AHP Synthesis Model for Energy Security Assessment of the Serbian Natural Gas Sector" in Symmetry, MDPI AG (2020). https://doi.org/10.3390/sym12060908
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...... process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine. Keywords: availability; fuzzy theory; AHP mul ...
... process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine. Keywords: availability; fuzzy theory; AHP mult ...
... second mode of the expert assessment is represented by the mutual ranking of partial indicators. In this paper, ranking is done using the AHP method. The Fuzzy-AHP synthesis model is represented through the fuzzy inference model where inputs are represented with fuzzificated estimates of partial indicators ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
-
Prioritization of strategic measures for strengthening the security of supply of the Serbian natural gas sector
To strengthen the security of supply of the Serbian gas sector, it is necessary to analyze the impact of planned strategic measures. The analysis involves the identification of the most influential threats to the security of natural gas supply and prioritization of the strategic measures for overcoming the consequences of threats. The proposed methodology is based on Fuzzy Analytic Hierarchy Process. The obtained weights for the identified threats and strategic measures are formed according to experts' judgments. The results ...Sigurnost snabdevanja, Donošenje odluka, Snabdevanje prirodnim gasom, Fazi AHP, Energetski indikatoriBoban Pavlović, Dejan Ivezić, Marija Živković. "Prioritization of strategic measures for strengthening the security of supply of the Serbian natural gas sector" in Energy Policy, Elsevier BV (2020). https://doi.org/10.1016/j.enpol.2020.111936
-
Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM
Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric (2022)The risk assessment of engineering systems represents an important part of the quality of service and dependability. The existing methods for risk evaluation use crisp sets for rating partial indicators’ proposition and their cumulative products as an overall indicator. In this paper, existing FMEA and FMECA methods have been improved using the fuzzy expert system for calculating the risk priority number. The application of fuzzy logic allows the use of linguistic descriptions for risk analysis. In this way, the ...Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric. "Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM" in Mathematics, MDPI AG (2022). https://doi.org/10.3390/math10050811
-
Development of the hybrid MCDM model for evaluating and selecting bucket wheel excavators for the modernization process
This paper presents a methodology for evaluating and ranking different bucket wheel excavators (BWE) for determining which machine should enter in the process of revitalization and modernization. Various multicriteria methods are used. Combining them achieves the best effect when choosing BVE for the modernization process. AHP, TOPSIS, VIKOR, and PROMETHEE methods are used. The hybrid models are developed from the multi-criteria decision making (MCDM) methods and they are used to evaluate the basic indicators that characterize the operation of ...Snezana Savkovic, Predrag Jovancic, Stevan Djenadic, Milos Tanasijevic, Filip Miletic. "Development of the hybrid MCDM model for evaluating and selecting bucket wheel excavators for the modernization process" in Expert Systems with Applications, Elsevier BV (2022). https://doi.org/10.1016/j.eswa.2022.117199
-
Primena AHP и WoEmetode u proceni podložnosti terena na kliženje za područje opštine Krupanj
Biljana Abolmasov, Jelka Krušić, Katarina Andrejev, Miloš Marjanović, Ranka Stanković, Uroš Đurić (2017)... klizišta, AHP metoda, WoE metoda, karta podložnosti na kliženje SUMMARY This paper is an example of landslide susceptibility assessment in Krupanj municipality in western Serbia, using two different multicriteria methods: Analytical Hierarchy Process (AHP) and Weight of Evidence (WoE). AHP is based ...
... detaljnih geotehničkih istraživanja terena. 2. METODE PROCENE 2.1. AHP – analitički hijerarhijski postupak Analitički hijerarhijski postupak (AHP) je metoda koja omogućava kvantifikaciju ekspertske procene u višekriterijumskoj analizi. Prema AHP metodi definiše se značaj skupa kriterijuma [24], što u primeni ...
... 4. REZULTATI I DISKUSIJA Na osnovu usvojene metodologije, primenjena su AHP i WoE metode procene podložnosti na kliženje za područje opštine Krupanj. U AHP modelu procene podložnosti terena na kli- ženje formirana je AHP matrica vrednosti pojedinačnih parametara (Tabela 2). Odnos značaja između ...Biljana Abolmasov, Jelka Krušić, Katarina Andrejev, Miloš Marjanović, Ranka Stanković, Uroš Đurić . "Primena AHP и WoEmetode u proceni podložnosti terena na kliženje za područje opštine Krupanj" in Izgradnja, Beograd : Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista Izgradnja (2017): 239-246
-
Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining
Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović (2019)... 95 Shantui SD32W 23 29.49 Other 23 29.48 Total: 78 100 2.2. AHP AHP, which was used in the paper, represents the most commonly used mathematical method and is based on a multiple-criteria approach in the analysis of the existing data. AHP was designed by Tomas L. Saaty [16], and it can be used in numerous ...
... advantage of the AHP method is its ability to identify and analyse the inconsistency of the decision-maker in the process of deciding on the priorities in the hierarchal structure. The general schematic display of the AHP method structure is shown in Figure 2. The goal (zero level) of the AHP method structure ...
... parameters of dozer is defined. The choice of the optimal type of dozer was conducted by using the analytical hierarchy process (AHP). Keywords: analytical hierarchy process (AHP); dozers; coal mining; open-cast mining 1. Introduction The process of ore exploitation in open-cast coal mining is complex ...Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović . "Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining" in Energies, MDPI (2019). https://doi.org/https://doi.org/10.3390/en12122245
-
Evaluation And Perspectives Of Underground Coal Mines In Serbia
... AHP evaluation of underground coal mines in Serbia The Analytic Hierarchy Process (AHP) is a multi-criteria decision-making approach introduced by Saaty [4]. The AHP method enables users to determine the weights of the parameters in the solution of a multi-criteria problem. In the AHP method ...
... such as Analytical Hierarchy Process (AHP), for the purpose of evaluating and ranking of the mines operated by PCUCE. Criteria for evaluation Initial step for evaluation of mines operated by PCUCE is to select criteria which will be used in AHP. For this purpose following criteria are selected: ...
... number of pages, scores of selected criteria required for AHP are given in Table 2. To provide more complete picture, coal productions achieved in period 2010-2015 in these mines are given in Table 3. Table 2. Scores of criteria for AHP C1 C2 C3 C4 C5 C6 C7 Vrška Čuka 1 2 3 1 4 2 2 Ibarski ...Vladimir Milisavljević, Milena Lekić, Ivica Ristović, Vojin Čokorilo, Aleksandar Cvjetić. "Evaluation And Perspectives Of Underground Coal Mines In Serbia" in 7th Balkan Mining Congress Preceedings - BalkanMine2017, Prijedor, 11-13. oktobar 2017., Banjaluka : University of Banjalika, Faculty of Mining, RS, BiH (2017)
-
Effectiveness Analysis of Different Bucket-wheel Excavators
Coal production in open-pit lignite mines in the Republic of Serbia is performed with continuous work systems. In addition to coal production, the same systems are used for the exploitation of large quantities of overburden. According to the reliability concept, continuous systems are in linear connection. If the failure occurs in one part of the system, that will produce a downtime of the entire system. The initial and most important factor of continuous systems is the bucket-wheel excavator. It ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Miloš Tanasijević, Filip Miletić. "Effectiveness Analysis of Different Bucket-wheel Excavators" in 8th International Conference Mining and Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple ...dimenzije minibloka, višekriterijumska analiza, AHP, modeliranje ležišta, planiranje na površinskim kopovimaPetar Marković, Dejan Stevanović, Milica Pešić Georgiadis, Mirjana Banković. "Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning" in Underground Mining Engineering, Univerzitet u Beogradu, Rudarsko-geološki fakultet (2021)
-
Assessment of landslide susceptibility using expert AHP method for the Ljubovija Municipality
Krušić Jelka, Marjanović Miloš, Andrejev Katarina, Abolmasov Biljana. "Assessment of landslide susceptibility using expert AHP method for the Ljubovija Municipality" in Abstract Book 17th Serbian Geological Congress, May 17‐20, Vrnjačka Banja 2, Beograd:Srpsko geološko društvo (2018): 625-629
-
Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja
Hidraulični bageri primenjuju se u različitim oblastima privrede a najzastupljeniji su u građevinarstvu i rudarstvu. Na površinskim kopovima sa kontinualnim sistemima, klasifikuju kao pomoćna mehanizacija a na površinskim kopovima sa diskontinualnim sistemima, kao osnovna mehanizacija. Kako je u oba slučaja njihova primena neizostavna, važno je izvršiti adekvatnu analizu postojećih podataka, u cilju optimizacije izbora tipa hidrauličnog bagera u odnosu na uslove rada datog površinskog kopa. U radu su opisane različite višekriterijumske metode koje su korišćene za analizu hidrauličnih bagera. ...... hidrauličnih bagera. 4.1 AHP metoda Analytical Hierarchy Process (AHP) je matema- tička metoda sa višekriterijumskim pristupom u odlu- čivanju. Osmislio je Tomas L. Saaty [13] i spada u najpoznatije i najprimenjenije metode koje se koriste u analizi postojećih podataka. AHP metoda pruža mogu- ćnost ...
... različiti faktori što olakšava kombi- novanje delova u celinu [14]. Hijerarhijska struktura AHP metode prikazana je na slici 1. Slika 1 - Hijerarhijska strukura AHP metode Matematički sled proračuna AHP metode zapo- činje međusobnim upoređivanjem dva elementa. Upo- ređivanje se vrši primenom ...
... definisanom matematičkom modelu, AHP metoda je u prvom koraku iskorišćena za definisanje težinskih faktora (faktora preferencija) razmatranih parametara. S obzirom da je u analizu uključeno 12 parametara mašine, njihov međusobni odnos prioriteta prikazan je u tabeli 4. AHP metoda na najkvalitetniji ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Filip Miletić, Ivan Janković. "Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja" in Tehnika, Centre for Evaluation in Education and Science (CEON/CEES) (2019). https://doi.org/10.5937/tehnika1903369D
-
Impact of geo-environmental factors on landslide susceptibility using an AHP method: A case study of Fruška Gora Mt, Serbia
Marjanović Miloš, Abolmasov Biljana, Đurić Uroš, Bogdanović Snežana. "Impact of geo-environmental factors on landslide susceptibility using an AHP method: A case study of Fruška Gora Mt, Serbia" in Geološki anali Balkanskoga poluostrva 74, Beograd, Srbija:Rudarsko-geološki fakultet i Institut za regionalnu geologiju i paleontologiju, Beograd (2013): 91-100. https://doi.org/10.2298/GABP1374091M
-
Multivarijabilni modeli upravljanja u rudarstvu
Marjan M. Hudej (2014-02-03)osetljivost i rizik. Više pobuda generiše ovakvu atribuciju. Prva je, multivarijabilnostambijentalnih uslova i funkcionalna i strukturna složenost rudarskih sistema (čovek -priroda (radna sredina) - mašina – okruženje); Druga se odnosi na ne postojanje opštenaučne saglasnosti oko ocene pogodnosti modela za podršku odlučivanju i upravljanje.Treća, ako bi saglasnost i postojala, nije sigurno da bi raspoloživi modeli, metode i taktike,dale ekvivalentne rezultate za iste rudničke uslove. Četvrta, sistemske nauke još uveknemaju opšte prihvaćen i u praksi primenljiv algoritam izbora najboljeg rešenja ...... i podkriterijuma za izbor najbolje alternative, izvodi se analiza AHP metodom. U realnim situacijama, zbog nepotpunih informacija ili informacija do kojih je nemoguće doći, podaci (atributi) najčešće nisu deterministički, već fazi – neprecizni. Ovaj pristup je korišćena kod izbora metode ventilacije ...
... ,,,2,1,,0 ,,2,1,,1 akodominirana bitineće 3.3. METODA AHP AHP metodu analize hijerarhijskog procesa (AHP, engl. Analytic Hierarchy Process) za multiatributno odlučivanje razvio je Thomas Saaty [79]. Koncepcijski AHP metoda je postavljena na poređenju parova alternativa, poredi se svaka ...
... pouzdanost, tačnost i dr. Rešenje problema autor vidi u integrisanoj primeni AHP i PROMETHEE metode, odnosno u pristupu u kome AHP metoda ima analitičko- hijerarhijsku funkciju, a PROMETHEE funkciju evaluacije rangiranja. Dakle AHP metoda se koristi u strukturnoj analizu problema izbora opreme i za utvrđivanje ...Marjan M. Hudej. "Multivarijabilni modeli upravljanja u rudarstvu" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2014-02-03)
-
Multivarijabilni modeli upravljanja u rudarstvu
Marjan M. Hudej (2014-02-03)osetljivost i rizik. Više pobuda generiše ovakvu atribuciju. Prva je, multivarijabilnostambijentalnih uslova i funkcionalna i strukturna složenost rudarskih sistema (čovek -priroda (radna sredina) - mašina – okruženje); Druga se odnosi na ne postojanje opštenaučne saglasnosti oko ocene pogodnosti modela za podršku odlučivanju i upravljanje.Treća, ako bi saglasnost i postojala, nije sigurno da bi raspoloživi modeli, metode i taktike,dale ekvivalentne rezultate za iste rudničke uslove. Četvrta, sistemske nauke još uveknemaju opšte prihvaćen i u praksi primenljiv algoritam izbora najboljeg rešenja ...... i podkriterijuma za izbor najbolje alternative, izvodi se analiza AHP metodom. U realnim situacijama, zbog nepotpunih informacija ili informacija do kojih je nemoguće doći, podaci (atributi) najčešće nisu deterministički, već fazi – neprecizni. Ovaj pristup je korišćena kod izbora metode ventilacije ...
... ,,,2,1,,0 ,,2,1,,1 akodominirana bitineće 3.3. METODA AHP AHP metodu analize hijerarhijskog procesa (AHP, engl. Analytic Hierarchy Process) za multiatributno odlučivanje razvio je Thomas Saaty [79]. Koncepcijski AHP metoda je postavljena na poređenju parova alternativa, poredi se svaka ...
... pouzdanost, tačnost i dr. Rešenje problema autor vidi u integrisanoj primeni AHP i PROMETHEE metode, odnosno u pristupu u kome AHP metoda ima analitičko- hijerarhijsku funkciju, a PROMETHEE funkciju evaluacije rangiranja. Dakle AHP metoda se koristi u strukturnoj analizu problema izbora opreme i za utvrđivanje ...Marjan M. Hudej. "Multivarijabilni modeli upravljanja u rudarstvu" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2014-02-03)
-
Application of a Method for Intelligent Multi-Criteria Analysis of the Environmental Impact of Tailing Ponds in Northern Kosovo and Metohija
Gordana Milentijević, Blagoje Nedeljković, Milena Lekić, Zoran Nikić, Ivica Ristović, Jelena Đokić (2016)... explained in detail in numerous papers [21]. The AHP method is applied for analysis of the decision-making process and solving complex problems, utilizing elements of targets, criteria, sub-criteria and alternatives [22]. The most common application of the AHP method is a result of its ability to identify ...
... Based on results of the calculation done by AHP and PROMETHEE methods, final alternative rank was given—tailing ponds according to the their negative impact to the environment. Energies 2016, 9, 935 11 of 18 Matrix with double comparison is formed by AHP method based on previously set criteria (Table ...
... Tvrd̄anski Do, A5 Bostanište and A2 Gornje Polje. Energies 2016, 9, 935 15 of 18 Table 12. The rank of solutions according to the AHP and PROMETHEE methods. Rank AHP PROMETHEE A3—Žitkovac 1 1 A4—Tvrd̄anski Do 2 2 A5—Bostanište 3 3 A2—Gornje Polje 4 4 A1—Žarkov Potok 5 5 It should be noted that ...Gordana Milentijević, Blagoje Nedeljković, Milena Lekić, Zoran Nikić, Ivica Ristović, Jelena Đokić. "Application of a Method for Intelligent Multi-Criteria Analysis of the Environmental Impact of Tailing Ponds in Northern Kosovo and Metohija" in Energies, MDPI AG (2016). https://doi.org/10.3390/en9110935
-
Методологија интегралне анализе сценарија енергетског развоја
Александар Маџаревић (2019)енергетска безбедност, сценарио развоја, фази логика, сигурност снабдевања, доступност, расположивост, природни гас... вишекритеријумске АХП (Analytic Hierarchy Process) методе. На тај начин рангирни подаци се користе као улазни подаци фази скупа, који се даље анализирају у поступку фази композиције. Као резултат фази композиције настаје оцена енергетске безбедности у фазификованој форми. Излазни подаци фази скупа се у том ...
... Process (АХП). Ова метода карактеристична је по томе што даје могућност наглашавања утицаја одређеног парцијалног индикатора у опису синтезног индикатора и свођења субјективног утицаја аутора модела на минимум. Употреба АХП анализе у оквиру фази композиције није новина, тј. моделирање фази сетовима уз ...
... 841 0.619 0.238 0 0 μЕ2-SC6 1 1 0 0 0 0 0 0 0 0 Рангирање исхода применом АХП методе Приликом формирања исхода max-min фази композиције за сваку комбинацију одређује се исход у чије дефинисање се укључује АХП критеријумска анализа. РУДАРСКО-ГЕОЛОШКИ ФАКУЛТЕТ 146 МЕТОДОЛОГИЈА ...Александар Маџаревић. Методологија интегралне анализе сценарија енергетског развоја, Рударско-геолошки факултет, 2019
-
Inženjerskogeološki kriterijumi kao deo višekriterijumske analize izbora lokacija deponija
Sonja M. ĐOKANOVIĆ (2014)Sonja M. ĐOKANOVIĆ. Inženjerskogeološki kriterijumi kao deo višekriterijumske analize izbora lokacija deponija, Beograd:Rudarsko-geološki fakultet, 2014
-
A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System
This paper presents a model for determining fuzzy evaluations of partial indicators of the availability of continuous systems at coal open pits using a neuro-fuzzy inference system. The system itself is a combination of fuzzy logic and artificial neural networks. The system availability is divided into partial indicators. By combining the fuzzy logic and artificial neural networks, a model is obtained that has the ability to learn and uses expert judgment for that learning. This paper deals with the ...системи, континуални системи експлоатације (роторни багер-транспортер-дробилично постројење), рударство, расположивост, меко рачунарство, фази логика, ANN, ANFISMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović, Filip Miletić. "A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System" in Energies, MDPI AG (2023). https://doi.org/10.3390/en16072958
-
Razvoj integralnog modela za optimizaciju diskontinualnog sistema proizvodnje na površinskim kopovima nemetala
Miodrag Čelebić (2024)Izbor optimalne mehanizacije u diskontinualnom sistemu transporta je jedna od najvažnijih odluka koju treba donijeti prilikom projektovanja površinskih kopova. Pri izboru optimalne mehanizacije, uticaj ima veliki broj faktora, kako prirodnih – geoloških i ekoloških, tako i tehničkih, ekonomskih i socijanih. Neki od njih se mogu izraziti numerički, u određenim mijernim jedinicama, a neki opisno, lingvističkim varijablama, shodno uslovima koji vladaju na rudnim ležištima, a koje karakterišu visok stepen neizvjesnosti i neodređenosti kako prilikom istraživanja, tako i tokom procesa eksploatacije ...izbor mehanizacije, tehnologija eksploatacije, diskontinualani sistem, ekspertsko odlučivanje, lingvističke varijable, MCDM, FAHPMiodrag Čelebić. Razvoj integralnog modela za optimizaciju diskontinualnog sistema proizvodnje na površinskim kopovima nemetala, Beograd : [M. Čelebić], 2024