Претрага
89 items
-
A survey of greenhouse gases production in central European lignites
Anna Pytlak, Anna Szafranek-Nakonieczna, Weronika Goraj, Izabela Śnieżyńska, Aleksandra Krążała, Artur Banach, Ivica Ristović, Mirosław Słowakiewicz, Zofia Stępniewska (2021)... conditions (Fig. 2). Bearing inmind that sampleswere collected im- mediately after excavation and kept hermetically closed, the KNN-W2 lignite must have been exposed to in situ oxidative conditions prior to excavation. This may be possible, due to the fact that the Konin deposit is built of a number ...
... taking place in the energy market, it is projected that in the short-to-medium term, most lignite-fired power plants will be closed, making lignite excavation unnecessary (Alves Dias et al., 2018). It is expected that this will reduce the scale of anthropogenic GHG emissions, as the coal will no longer ...Anna Pytlak, Anna Szafranek-Nakonieczna, Weronika Goraj, Izabela Śnieżyńska, Aleksandra Krążała, Artur Banach, Ivica Ristović, Mirosław Słowakiewicz, Zofia Stępniewska. "A survey of greenhouse gases production in central European lignites" in Science of The Total Environment, Elsevier (2021). https://doi.org/10.1016/j.scitotenv.2021.149551
-
The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers
One of the most important prerequisites for the successful operation of the open-cast lignite mine is to carry out all the auxiliary works timely with the necessary quality. The most important and most commonly used auxiliary machines are bulldozers. Engaging time of bulldozers use is in direct relation with the coefficients of the time and capacity utilization of the continuous system for the excavation of coal and tailings, which indicates their importance. More than 100 bulldozers have been hired ...Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović. "The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers" in 7th International Symposium Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2019)
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947
-
Hydrochemical impact of the hydraulic tunnel on groundwater in the complex aquifer system in Pirot, Serbia
Hidrogeohemijski procesi, hidrohemijske promene, karstna izdan, tunel pod pritiskom, multivarijantne statističke analizeMarina Ćuk, Igor Jemcov, Ana Mladenović, Marina Čokorilo Ilić. "Hydrochemical impact of the hydraulic tunnel on groundwater in the complex aquifer system in Pirot, Serbia" in Carbonates and Evaporites, Springer Science and Business Media LLC (2020). https://doi.org/10.1007/s13146-020-00563-y
-
BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations
Geology explorations in KCM runs from 1936. year up to these days and still ongoing. Results in >7,200 drill holes with ≈600,000 m of core drilling and gave lignite ore resources of > 4,1Bt, which 1,15Bt are excavated since 1986. of XIX up to early years of XXI century. For further mining operations in open pits stay 1,5Bt of lignite. Under waste heaps are ≈80 km2, additional 85 km2 should be filled. All of that masses/areas were, are ...Bojan Dimitrijević, Bogoljub Vučković, Radmila Gaćina. "BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations" in 17th International Conference of the open and underwater mining of minerals, Sts. Constantine and Helena Resort, Varna, 18-22 September, Bulgaria, Sofia, Bulgaria : Scientific and Technical Union of Mining, Geology and Metallurgy, (2023)
-
An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System
In this paper we describe the approach that has been used in the development of the Management Information System (MIS) in the Coal Mine Pljevlja in Montenegro. The methodology of this approach was based on new information technologies and management techniques which have already been successfully applied in other related fields. Its main goal was to introduce modern management techniques to mining, adapted to specific features of the mining industry, its operations and environment, thus enabling the tactical management ...... informed and intelligent in decision-making, more efficient in operation, safer, and more responsible to society. This paper is focused on the excavation process: ore delineation, development, production and waste management. Design and planning of these processes in the future needs to be closely ...Božo Kolonja, Ranka Stanković, Filip Vuković, Ivan Obradović. "An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System" in Proceedings of the Fifteenth International Symposium on Mine Planning and Equipment Selection, Torino, Italy, September 2006, Vol. 1,, Balkema (2006)
-
Дефинисање археолошких објеката на локалитету Кремените њиве применом Ојлерове 3Д деконволуције на магнетометријске податке
... al Geophysics is that it is non‐destructive, and with the increase in speed and measurement resolution, the costs of the investigation and excavation have decreased consi‐ derably. The use of magnetic measurements in archaeological prospecting allows to obtain the data on 739 the size ...Весна Цветков, Илија Васиљевић, Бранислав Сретеновић, Весна Дамњановић. "Дефинисање археолошких објеката на локалитету Кремените њиве применом Ојлерове 3Д деконволуције на магнетометријске податке" in Књига апстраката 17. Конгрес геолога Србије, Врњачка Бања 17-20. мај, Српско геолошко друштво (2018)
-
Characterization and Environmental Evaluation of Recycled Aggregates from Construction and Demolition Waste in Belgrade City Area (Serbia)
Filip Abramović, Miroslav Popović, Vladimir Simić, Vesna Matović, Radmila Šerović. "Characterization and Environmental Evaluation of Recycled Aggregates from Construction and Demolition Waste in Belgrade City Area (Serbia)" in Materials, MDPI AG (2024). https://doi.org/10.3390/ma17040820
-
Phase relations and physical indicators of municipal waste from old landfills in Serbia
Due to certain similarities of municipal waste and soil, usually for the determination of basic parameters of physical state, laboratory and field tests which are common in geotechnical investigations are used. It is often to construct an apparatus for special purpose to perform some specific laboratory and field tests. Therefore, different values of indicators of municipal waste physical state can be found in the literature. The basic reasons should be found in different definitions and methods that researchers use ...municipal waste, moisture content, unit weight, specific gravity, grain size distribution, porosityGeneral Computer Science... weighh usually used laboratory and field tests are those that are common in geotechnical investigations such as: direc field measurements (excavation of exploration pit at the landfili with measurement of volume and weight of excavated waste), measurements on samples from exploration boreholes ...Dragoslav R Rakić, Irena G Basarić Ikodinović, Jovana M Janković, Tina D Đurić. "Phase relations and physical indicators of municipal waste from old landfills in Serbia" in Japanese Geotechnical Society Special Publication, The Japanese Geotechnical Society (2021). https://doi.org/10.3208/jgssp.v09.cpeg016
-
Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia
Dragoljub Bajić, Dušan Polomčić (2014)A groundwater control system was designed to lower the water table and allow the pumping sta-tion “Bezdan 1” to be built. Based on a hydrodynamic analysis that suggested three alternative solutions, mul-ticriteria optimization was applied to select the best alternative. The fuzzy analytic hierarchy process methodwas used, based on triangular fuzzy numbers. An assessment of the various factors that influenced the selec-tion of the best alternative, as well as fuzzy optimization calculations, yielded the “weights” of the alternativesand the ...groundwater lowering, groundwater management scenario, fuzzy analytic hierarchy process,expert knowledge, triangular fuzzy numbers, linguistic variables... control system: the number of wells and their spatial distribution, and the time need- ed to achieve maximal lowering of the water table below the excavation for the “Bezdan 1” PS, were defined as follows: • Alternative 1 (A1): Long-term average stages of the canals within the study area (Baračka Canal ...Dragoljub Bajić, Dušan Polomčić. "Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia" in Geološki anali Balkanskoga poluostrva, Belgrade : University of Belgrade - Faculty of mining and geology (2014). https://doi.org/10.2298/GABP1475103B
-
Adaptive neuro-fuzzy prediction of operation of the bucket wheel drive based on wear of cutting elements
The capacity of the rotor excavator depends largely on the operation of the subsystem for digging. There is a great contribution to the correct and sharp teeth when the capacity is the highest. In the function of time, the teeth become clogged due to abrasive wear, or changes in their geometric shape. To analyze the bucket wheel drive in depend on wear of the cutting elements in this study adaptive neuro fuzzy inference system (ANFIS) approach was implemented. ANFIS ...Filip Miletić, Predrag D. Jovančić, Milos Milovančević, Dragan Ignjatović. "Adaptive neuro-fuzzy prediction of operation of the bucket wheel drive based on wear of cutting elements" in Advances in Engineering Software, Elsevier BV (2020). https://doi.org/10.1016/j.advengsoft.2020.102824
-
Analysis of the exhaust emissions inventory from auxiliary mining machines
Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović (2023)Open-pit coal mines are equipped with a large number of mining machines and vehicles with diesel engines. Due to common daily operation of these machines and vehicles large amounts of exhaust gases which contain numerous pollutants are emitted into the atmosphere. The demand to reduce air pollution induced the activities in developed countries to map and calculate all gases emitted by industries to formulate and select adequate preventive activities. In collaboration with machine manufacturers, emission standards for off-road machines ...Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović. "Analysis of the exhaust emissions inventory from auxiliary mining machines" in 9th International Conference Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology (2023)
-
Nelinearno dinamičko modelovanje potresa izazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija
Srđan D. Kostić (2013-11-04)U ovoj disertaciji, cilj istraživanja bio je određivanje dinamičkih svojstava potresaizazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija.Analiza potresa izvedena je sa dva aspekta – u prvom delu istraživanja izučavane suvremenske serije oscilovanja tla za vreme potresa, a u drugom delu vršena je analizastabilnosti fenomenološkog Baridž-Knopof modela bloka sa oprugom. Vremenske serijeoscilovanja tla proučavane su primenom postupka analize surogat podataka, kao ikorišćenjem metoda analize nelinearnih vremenskih serija (primena teoreme orazvijanju skalarne vremenske serije). Analiza vremenskih serija izvedena je ...potres, naponsko stanje, podzemne prostorije, bifurkacije, vremenskaserija, deterministički haos, stohastičnost, perturbacije, vremensko kašnjenje, jačina trenja... SEISMIC EVENTS INDUCED BY STRESS CHANGE DUE TO EXCAVATION OF HORIZONTAL UNDERGROUND CHAMBERS ABSTRACT In this dissertation, the aim of the research was to determine the dynamics of seismic events induced by the stress change due to excavation of horizontal underground chambers. The conducted ...
... promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija;Nonlinear dynamical modeling of seismic events induced by stress change due to excavation of horizontal underground chambers Srđan D. Kostić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] ...
... promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija;Nonlinear dynamical modeling of seismic events induced by stress change due to excavation of horizontal underground chambers | Srđan D. Kostić | Универзитет у Београду | 2013-11-04 | | http://dr.rgf.bg.ac.rs/s/repo/item/0003939 Дигитални ...Srđan D. Kostić. "Nelinearno dinamičko modelovanje potresa izazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2013-11-04)
-
Nelinearno dinamičko modelovanje potresa izazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija
Srđan D. Kostić (2013-11-04)U ovoj disertaciji, cilj istraživanja bio je određivanje dinamičkih svojstava potresaizazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija.Analiza potresa izvedena je sa dva aspekta – u prvom delu istraživanja izučavane suvremenske serije oscilovanja tla za vreme potresa, a u drugom delu vršena je analizastabilnosti fenomenološkog Baridž-Knopof modela bloka sa oprugom. Vremenske serijeoscilovanja tla proučavane su primenom postupka analize surogat podataka, kao ikorišćenjem metoda analize nelinearnih vremenskih serija (primena teoreme orazvijanju skalarne vremenske serije). Analiza vremenskih serija izvedena je ...potres, naponsko stanje, podzemne prostorije, bifurkacije, vremenskaserija, deterministički haos, stohastičnost, perturbacije, vremensko kašnjenje, jačina trenja... SEISMIC EVENTS INDUCED BY STRESS CHANGE DUE TO EXCAVATION OF HORIZONTAL UNDERGROUND CHAMBERS ABSTRACT In this dissertation, the aim of the research was to determine the dynamics of seismic events induced by the stress change due to excavation of horizontal underground chambers. The conducted ...
... promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija;Nonlinear dynamical modeling of seismic events induced by stress change due to excavation of horizontal underground chambers Srđan D. Kostić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] ...
... promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija;Nonlinear dynamical modeling of seismic events induced by stress change due to excavation of horizontal underground chambers | Srđan D. Kostić | Универзитет у Београду | 2013-11-04 | | http://dr.rgf.bg.ac.rs/s/repo/item/0003969 Дигитални ...Srđan D. Kostić. "Nelinearno dinamičko modelovanje potresa izazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2013-11-04)
-
Димензионисање камионског транспорта јаловине на површинском копу Угљевик Исток 1
Наталија Терзић (2024)Напредовањем рударења дошло је до потребе за експлоатацијом сложенијих и сиромашнијих лежишта, самим тим и повећањем трошкова.Профитабилна експлоатација лежишта минералних сировина захтева детаљну анализу свих техничко-економских фактора.Два најутицајнија фактора на профитабилност експлоатације руде јесу откопавање и транспорт, због тога је неопходно направити изводљив стратешки план који ће бити у складу са свим ограничењима и омогућити испуњавање свих планираних резултата.Транспорт на површинским коповима одвија се паралелно са осталим процесима експлоатације, стога је неопходно да сви системи буду усаглашени како не ...... Methodology Discounted Operating Cost Sftonne 0.00 Single Sided Discounted Average Cost Sftonne 0.00 Full Truck Excavation Target tonne 750,000.00 Average for 150 Shifts Time to move Excavation Target Days 134.47 < > \, Productivity_/A, Tyres & Fuel_/, Haul Cycle /A Cash Flow_A Plan / Cnuka 17. Marnej ...
... S/tonne .00 Single sided Discounted Average Cost S/tonne 000 FuliTruck xcavatior Target tonme 4.000.000,00 — Average for 150 Shifts Time to move Excavation Target Days 344,08 \Loader Hrs to move Target _ Op.Hour. 4306 Total Truck Hrs to move Target . Op.Hours. zi.530 Total cost to move Target. s ...Наталија Терзић. Димензионисање камионског транспорта јаловине на површинском копу Угљевик Исток 1, 2024
-
The Importance of Detailed Groundwater Monitoring for Underground Structure in Karst (Case Study: HPP Pirot, Southeastern Serbia)
... powerhouse. The tunnel is 9093 m long, its diameter is 4.5 m and the gradient 2.51h. It was constructed by standard excavation (first and last parts) and tubing (1/4 and 3/4) with concrete lining (Figure 1). Three observation wells, PP-1, PP-3 and PP-4, were deep-drilled along the tunnel and the screens ...
... operating regime of the tunnel (whether it is in or of operation—online or offline). While the tunnel was operating (online), monitoring was conducted at observation wells along the tunnel (approx 15 m distant), a control gate (water losses), springs, and a stream in the vicinity of the tunnel. Areas of the potential ...
... observation wells and at the control gate. While the tunnel was offline (empty tunnel) it was possible to access the tunnel, and in situ monitoring proved to be of great importance. Observations of quantitative parameters pointed out hydraulically critical tunnel zones, whilst the qualitative characteristics ...Marina Čokorilo Ilić, Ana Mladenović, Marina Ćuk, Igor Jemcov. "The Importance of Detailed Groundwater Monitoring for Underground Structure in Karst (Case Study: HPP Pirot, Southeastern Serbia)" in Water, MDPI AG (2019). https://doi.org/10.3390/w11030603
-
Geoenvironmental Investigations at a Smelter Location in Bor (Serbia)
Petar Papić, Zvonimir Milijić, Jana Stojković, Jovana Milosavljević, Maja Todorović, Marina Ćuk, Željko Kamberović (2014)Petar Papić, Zvonimir Milijić, Jana Stojković, Jovana Milosavljević, Maja Todorović, Marina Ćuk, Željko Kamberović. "Geoenvironmental Investigations at a Smelter Location in Bor (Serbia)" in Challenges : Sustainable Land Management – Climate Change, Advances in Geoecology 43, Catena Verlag GMBH (2014)
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617
-
Optimization and Analysis of Drilling and Blasting Parameters Using O-Pitblast Software
The development of modern technologies has enabled the application of specialized softwares in the field of mining through various segments and processes, including in works related to drilling and blasting. The application of specialized software for drilling and blasting with the use of modern technologies such as photogrammetry enabled more accurate data from the field for later processing. By processing data and creating a 3D model of the terrain for drilling and blasting works, it can obtain precise data, ...Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić. "Optimization and Analysis of Drilling and Blasting Parameters Using O-Pitblast Software" in Podzemni radovi, Beograd : Rudarsko-geološki fakultet (2024)
-
Stratigraphy and Microfauna (Radiolarians and Foraminifera) of the Upper Cretaceous (Upper Santonian–Lower Campanian) Carbonate Deposits in the Area of Struganik Village, Western Serbia)
Santonian, Campanian, radiolarians, planktonic foraminifera, biostratigraphy, limestones, Struganik, SerbiaLiubov Bragina, Nikita Bragin, Luidmila Kopaevich, Nevenka Đerić, Nataša Gerzina Spajić. "Stratigraphy and Microfauna (Radiolarians and Foraminifera) of the Upper Cretaceous (Upper Santonian–Lower Campanian) Carbonate Deposits in the Area of Struganik Village, Western Serbia)" in Stratigraphy and Geological Correlation, Pleiades Publishing Ltd (2020). https://doi.org/10.1134/S0869593820010037